About

Built by someone who has had to explain the variance

Zubos Planning is not a software company’s idea of how construction planning works. It is a scheduler’s answer to a problem he kept being handed.

Where it came from

I am Apurv. I work as an independent consultant to US contractors in estimating, CPM scheduling and quantity take-off, with a background in data-center infrastructure — the kind of job where a two-week slip in a switchgear delivery reorganizes everything behind it.

The pattern was always the same. A general contractor would run a genuinely good pull-planning session — the right foremen in the room, real commitments made, a wall full of stickies that everybody believed. Then the session would end, someone would photograph the wall, and within a fortnight the plan people were actually working to lived in three or four places at once.

Two plans. One the field trusts and one the contract runs on. By the time they visibly disagree, the argument is about which one was ever real.

Why the existing tools did not close it

Digital pull-planning tools made the wall shareable, which is worth something. Keeping that board and the schedule the job is measured against in step is a separate job.

That gap is the whole reason Zubos Planning exists. Not a better sticky note: a shared board that the whole project team can work on together, where the commitments made in the session are still visible in week six, and where what was promised and what got finished are both a matter of record.

Over a decade of U.S. construction project-controls experience, including scheduling, estimating, and data-center projects. Zubos Planning is built by someone who has had to stand in front of a room and explain a variance, which is a different job from designing software about one.

How it gets built

Roles are checked in more than one place: by Postgres row-level security, by API guards and in the interface. Automated tests cover those checks.

Where it is today

Zubos Planning is deliberately not large. What is there is tested, and this site states its limits alongside its capabilities.

If you run pull planning and a CPM master and you are tired of keeping both true by hand, that is exactly the problem this was built for. Ask for a walkthrough.